... ... @@ -232,7 +232,7 @@
232 232  After changing the settings, restart the BMS Mini device.
233 233  )))
234 234  
235 -=== SMA Sunny Island inverter ===
235 +=== Sunny Island inverter ===
236 236  
237 237  To change the communication parameters with an SMA Sunny Island inverter, select the "External equipment → inverters → SMA Sunny Island inverter" section:
238 238  
... ... @@ -251,43 +251,6 @@
251 251  
252 252  When working with the Sunny Island inverter, the BMS Mini device sends messages with the values of voltage and charge/discharge current continuously with the period “Output period”: Charging voltage, Charging current, Discharging voltage, Discharging current.
253 253  
254 -=== Pylontech inverter ===
255 -
256 -To change the parameters of communication with a Pylontech inverter, select the "External equipment → Inverters and loads → Pylontech inverter" section:
257 -
258 -[[image:1740580440283-115.png||data-xwiki-image-style-alignment="center" data-xwiki-image-style-border="true" height="126" width="800"]]
259 -
260 -In this section:
261 -
262 -* Enable – a flag to enable communication with the inverter;
263 -* Type – invertor type:
264 -** Pylontech;
265 -** Solis;
266 -* Charge voltage, V – maximum charging voltage, V;
267 -* Charge current, А – maximum charging current, A;
268 -* Discharge voltage (min) – minimum discharging voltage, V;
269 -* Discharge current – maximum discharging current, А.
270 -
271 -=== ASTOM load bank (cycling) ===
272 -
273 -To change the parameters of communication with a ASTOM load bank, select the "External equipment → Inverters and loads → ASTOM load bank (cycling)" section:
274 -
275 -[[image:1740580507794-408.png]]
276 -
277 -In this section:
278 -
279 -* Enable – a flag to enable communication with the bank;
280 -* Number of discharge cycles;
281 -* Minimum voltage of charged cells, V;
282 -* Voltage deviation of charged cells – minimum allowable deviation of the cells voltage at which battery states as charged, V;
283 -* Maximum discharge current, A;
284 -* Cell voltage to stop discharging, V;
285 -* SOC to be at the end of cycling – target SOC at the end of charge-discharge cycling, V;
286 -* Delay before starting discharging – a delay before transmitting command to the load to start discharging, millisecond;
287 -* Check the difference between the min and max cell voltage – a flag to enable check of difference between the minimum and maximum cell voltages to generate an error;
288 -* Voltage difference – difference between the minimum and maximum cell voltages for error to be generated and cycling to be stopped, V;
289 -* Delay before setting the error – a delay before generating an error, second.
290 -
291 291  === HYG Class I-III truck ===
292 292  
293 293  The HYG Class I-III equipment is installed on the forklifts by the group of companies HYSTER-YALE.
1740580440283-115.png
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.admin
Size
... ... @@ -1,1 +1,0 @@
1 -22.6 KB
Content
1740580507794-408.png
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.admin
Size
... ... @@ -1,1 +1,0 @@
1 -32.4 KB