Changes for page 3.5 External equipment

Last modified by Admin on 2025/02/26 17:09

From version 2.2
edited by Admin
on 2025/02/26 14:32
Change comment: There is no comment for this version
To version 5.1
edited by Admin
on 2025/02/26 14:36
Change comment: Загрузить новое вложение 1740580581620-608.png

Summary

Details

Page properties
Content
... ... @@ -232,7 +232,7 @@
232 232  After changing the settings, restart the BMS Mini device.
233 233  )))
234 234  
235 -=== Sunny Island inverter ===
235 +=== SMA Sunny Island inverter ===
236 236  
237 237  To change the communication parameters with an SMA Sunny Island inverter, select the "External equipment → inverters → SMA Sunny Island inverter" section:
238 238  
... ... @@ -251,6 +251,43 @@
251 251  
252 252  When working with the Sunny Island inverter, the BMS Mini device sends messages with the values of voltage and charge/discharge current continuously with the period “Output period”: Charging voltage, Charging current, Discharging voltage, Discharging current.
253 253  
254 +=== Pylontech inverter ===
255 +
256 +To change the parameters of communication with a Pylontech inverter, select the "External equipment → Inverters and loads → Pylontech inverter" section:
257 +
258 +[[image:1740580440283-115.png||data-xwiki-image-style-alignment="center" data-xwiki-image-style-border="true" height="126" width="800"]]
259 +
260 +In this section:
261 +
262 +* Enable – a flag to enable communication with the inverter;
263 +* Type – invertor type:
264 +** Pylontech;
265 +** Solis;
266 +* Charge voltage, V – maximum charging voltage, V;
267 +* Charge current, А – maximum charging current, A;
268 +* Discharge voltage (min) – minimum discharging voltage, V;
269 +* Discharge current – maximum discharging current, А.
270 +
271 +=== ASTOM load bank (cycling) ===
272 +
273 +To change the parameters of communication with a ASTOM load bank, select the "External equipment → Inverters and loads → ASTOM load bank (cycling)" section:
274 +
275 +[[image:1740580507794-408.png]]
276 +
277 +In this section:
278 +
279 +* Enable – a flag to enable communication with the bank;
280 +* Number of discharge cycles;
281 +* Minimum voltage of charged cells, V;
282 +* Voltage deviation of charged cells – minimum allowable deviation of the cells voltage at which battery states as charged, V;
283 +* Maximum discharge current, A;
284 +* Cell voltage to stop discharging, V;
285 +* SOC to be at the end of cycling – target SOC at the end of charge-discharge cycling, V;
286 +* Delay before starting discharging – a delay before transmitting command to the load to start discharging, millisecond;
287 +* Check the difference between the min and max cell voltage – a flag to enable check of difference between the minimum and maximum cell voltages to generate an error;
288 +* Voltage difference – difference between the minimum and maximum cell voltages for error to be generated and cycling to be stopped, V;
289 +* Delay before setting the error – a delay before generating an error, second.
290 +
254 254  === HYG Class I-III truck ===
255 255  
256 256  The HYG Class I-III equipment is installed on the forklifts by the group of companies HYSTER-YALE.
1740580440283-115.png
Author
... ... @@ -1,0 +1,1 @@
1 +XWiki.admin
Size
... ... @@ -1,0 +1,1 @@
1 +22.6 KB
Content
1740580507794-408.png
Author
... ... @@ -1,0 +1,1 @@
1 +XWiki.admin
Size
... ... @@ -1,0 +1,1 @@
1 +32.4 KB
Content
1740580581620-608.png
Author
... ... @@ -1,0 +1,1 @@
1 +XWiki.admin
Size
... ... @@ -1,0 +1,1 @@
1 +30.2 KB
Content