Changes for page 3.3 Control

Last modified by Admin on 2025/05/30 16:50

From version 12.29
edited by Admin
on 2025/02/11 16:47
Change comment: There is no comment for this version
To version 12.28
edited by Admin
on 2025/02/11 16:47
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -291,6 +291,7 @@
291 291  * If "Discharge request" is received, procedure is done as described in [[Discharge>>doc:||anchor="HDischarge"]] section;
292 292  * If both signals received, "Charge request" has a priority.
293 293  
294 +
294 294  In addition to controlling the charge/discharge contactor, the charge/discharge controller calculates and transmits to the upper-level system the maximum allowable current value with which the modular battery can be charged ("Charge current limit") and discharged ("Discharge current limit"), as well as the maximum regeneration current value with which the modular battery can be charged during operation under load ("Regeneration current limit"). The calculation of the charge, discharge and regeneration currents of the entire battery is performed based on the number of battery modules operating for charge or discharge and the maximum charge and discharge current values ​​transmitted by them:
295 295  
296 296  * "Charge current limit" and "Regeneration current limit" are calculated only if there is "Charge request";