Changes for page 3.3 Control
Last modified by Admin on 2025/05/30 16:50
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -280,15 +280,17 @@ 280 280 281 281 The device controls two processes: **joining battery modules** and **closing the main charging/discharging contactor**. 282 282 283 -The operation of the **joining battery modules** depends on the signal received: 284 284 285 -* If "Join to charge" is received, joining procedure is done as described in Charge section; 286 -* If "Join to discharge" is received, joining procedure is done as described in Discharge section; 287 -* If both signals received, "Join to charge" has a priority. 284 +The operation of the **joining battery modules** is described by the following steps: 288 288 289 -The operation of **closing main charging/discharging contactor **depends on the signal received: 286 +1. Battery modules are disabled. When the “Join to charge” or “Join to discharge” request is received and the voltage and corresponding current unbalance errors (Voltage unbalance (DCH), Current unbalance (DCH), Discharging current unbalance) are cleared, go to step 2. 287 +1. Checking the voltage unbalance of battery modules (the duration of the check is set in the settings). If there is no imbalance or errors are ignored (“Always on” and “Partially balanced”), go to step 3, otherwise open all discharging contactors, and go to step 1. 288 +1. Closing the precharging contactors of the battery modules (optional). Go to step 4. 289 +1. Closing the discharging contactors of the battery modules. The battery modules are self-balancing. Go to step 5. 290 +1. Checking intermodular balancing currents (the duration of the check is set in the settings). If there is no current unbalance (“Current unbalance (DCH)”) or errors are ignored (“Always on”), go to step 6, otherwise open all discharging contactors, and go to step 1. 291 +1. The battery modules are joined. If the “Join to discharge” request is cleared or "Discharging current unbalance" error occurs, go to step 1. 290 290 291 - If"Chargerequest"isreceived,joiningprocedure is293 +The operation of **closing main discharging contactor** is described in the following steps: 292 292 293 293 1. The main discharging contactor “Discharging” is open. When the “Discharge request” is received, the voltage and current unbalance errors (“Voltage unbalance (DCH)”, “Current unbalance (DCH)”, “Discharging current unbalance”) are cleared, and the battery modules are joined, go to step 2. 294 294 1. Closing the main precharging contactor (optional). Go to step 3.