Changes for page 3.5 External equipment
Last modified by Admin on 2025/06/19 12:32
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -93,7 +93,7 @@ 93 93 94 94 (% class="box warningmessage" %) 95 95 ((( 96 -**Warning! **To work properly with the charger, it is necessary to turn on sending synchronization messages over the CANopen network (see [[CAN 2(int)>>doc:Battery management systems.BMS Main 3.3\. Configuration.3\.6 Connectivity.WebHome||anchor="HCAN2int"]]).96 +**Warning! **To work properly with the charger, it is necessary to turn on sending synchronization messages over the CANopen network (see [[CAN1 (ext)>>doc:Battery management systems.BMS Main 3.3\. Configuration.3\.6 Connectivity.WebHome||anchor="HCAN1ext"]]). 97 97 ))) 98 98 99 99 (% class="box infomessage" %) ... ... @@ -140,7 +140,6 @@ 140 140 * Receive timeout – a timeout for receiving packets from the charger (if there is no data being received from the charger for a given time, the connection loss flag is set), millisecond; 141 141 * Charge voltage – maximum charging voltage, V; 142 142 * Charge current – maximum charging current, A; 143 -* Current rize time, second; 144 144 * Set “Charger connected” signal if the charger is online – a flag to generate the “Charger connected” signal if connection with the charger is established. 145 145 146 146 Algorithm for working with the charger: ... ... @@ -285,7 +285,7 @@ 285 285 * Number of retries to restart nominal charge – number of retries to restart nominal charge after connection loss with charger; 286 286 * Set “Charger connected” signal if the charger is online – a flag to generate the “Charger connected” signal if connection with the charger is established. 287 287 288 -=== S MA Sunny Island inverter ===287 +=== Sunny Island inverter === 289 289 290 290 To change the communication parameters with an SMA Sunny Island inverter, select the "External equipment → Inverters and loads → SMA Sunny Island inverter" section: 291 291