Changes for page 3.3 Control
Last modified by Admin on 2026/04/30 15:56
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -402,10 +402,12 @@ 402 402 403 403 The BMS Main 3 / BMS Main 2R device can control the precharge contactor. The precharge contactor is used to charge the intermediate capacity with low current and usually placed with the limiting resistor in parallel to charging or discharging contactor. 404 404 405 - BMS Main3 device detectserrors whilepre-charging theloadcapacityby monitoringthe currentand voltagedifferencebeforeand aftercontactors.405 +In **simple **mode precharge contactor closes af before the closing Charge of Discharge contactors 406 406 407 -BMS Main 2Rdevicedetectserrors while pre-charging the load capacityonlyby monitoring the current.407 +BMS Main 3 can detect errors while pre-charging the load capacity by monitoring the current and voltage difference before and after contactors. 408 408 409 +BMS Main 2R can detect errors while pre-charging the load capacity __only__ by monitoring the current. 410 + 409 409 Also BMS can measure the power dissipated on precharge resistor and generate an error if it greater than configured limit. 410 410 411 411 TBA