... ... @@ -402,10 +402,12 @@
402 402  
403 403  The BMS Main 3 / BMS Main 2R device can control the precharge contactor. The precharge contactor is used to charge the intermediate capacity with low current and usually placed with the limiting resistor in parallel to charging or discharging contactor.
404 404  
405 -BMS Main 3 device detects errors while pre-charging the load capacity by monitoring the current and voltage difference before and after contactors.
405 +In **simple **mode precharge contactor closes af before the closing Charge of Discharge contactors
406 406  
407 -BMS Main 2R device detects errors while pre-charging the load capacity only by monitoring the current.
407 +BMS Main 3 can detect errors while pre-charging the load capacity by monitoring the current and voltage difference before and after contactors.
408 408  
409 +BMS Main 2R can detect errors while pre-charging the load capacity __only__ by monitoring the current.
410 +
409 409  Also BMS can measure the power dissipated on precharge resistor and generate an error if it greater than configured limit.
410 410  