Changes for page 3.5 Battery control
Last modified by Admin on 2025/03/10 12:50
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -110,7 +110,7 @@ 110 110 **Note:** In case of errors in the system operation, the opening of the discharging relay is performed either immediately or with a delay T,,off,, (depends on the settings described below). 111 111 ))) 112 112 113 -The board supports controlling the precharging relay. The duration of switching on the precharging relay and precharge current thresholdbefore closing the discharging (load) relayareadjustable.113 +The board supports controlling the precharging relay. The duration of switching on the precharging relay before closing the discharging (load) relay is adjusted. 114 114 115 115 When the power down request occurs, the discharging relay opens after delay T,,off,,. Reclosing the discharging relay is performed if the power down request is removed. 116 116