Changes for page 2. Installation and connection
Last modified by Admin on 2025/03/18 12:51
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -2. Connection1 +2. Installation and connection - Content
-
... ... @@ -1,5 +1,13 @@ 1 -== 2.1 Connection procedure ==1 +== 2.1 Installation procedure == 2 2 3 +Overall and mounting dimensions of the BMS Main 2.1 are shown in Figure 29. 4 + 5 +[[Dimensions of the BMS Main 2.1>>image:1732198397369-222.png||data-xwiki-image-style-alignment="center" height="393" width="556"]] 6 + 7 +== == 8 + 9 +== 2.2 Connection procedure == 10 + 3 3 The mounting area of the BMS Main 2.1 must be protected from mechanical particles (dust, dirt, large objects) and water. The installation site must provide convenient access for subsequent connection to the device’s headers. 4 4 5 5 1. Connect the charging and discharging contactors to the P6-P9 headers.